How oversize permit fees work, and where states list them

No national price exists for an oversize permit. Each state sets its own fees in its own law or rules, and FHWA confirms that permits are “a State option.” The fee usually depends on your permit type, your width and how far over legal weight you run. This post explains the common fee structures and shows five states’ published fees as of the date at the bottom. Fees change, so open each state’s schedule before you budget a move.

The common fee structures

State fee schedules mix a few building blocks:

  • A flat base fee per permit. Most single-trip permits start here.
  • A width step. Some states charge more once the load passes a set width.
  • A weight charge. States price overweight by the pound or by distance and weight together.
  • Annual and period permits. These carry one larger fee for a year, a season or a month.
  • Superload and review fees. The biggest moves pay for application review or engineering work on top of the permit.
  • Processing extras. These include electronic transmittal fees, card fees and refund fees.

Five states show how the pieces combine.

Pennsylvania: base fee by width, plus ton-miles

Pennsylvania’s fee list took effect July 1, 2025. For most single-trip load types, the fee reads “$46 (If < 14’ wide) + .04 ton-mile for overweight” or “$97 (If > 14’ wide) + .04 ton-mile for overweight.” The ton-mile charge ties the overweight fee to both distance and weight.

Other Pennsylvania examples from the same list:

  • Mobile home and modular housing units: $53 under 14 feet wide, $103 over 14 feet.
  • Superload: preliminary fees of $68 plus $12 per county, then the single-trip permit fee. The list adds “Additional fees could occur.”
  • Annual permits by commodity, such as $707 for construction equipment.
  • A $52 refund processing fee.

North Carolina: state fee range, then per-1,000-pound superload charges

North Carolina’s handbook lists a single-trip state fee of $12 to $48, valid 10 calendar days for one trip. The annual permit costs $185 per vehicle for nondivisible general commodities and $200 per vehicle for mobile homes.

Superloads cost more. NCDOT’s superload publication sets:

  • A $100 nonrefundable application fee.
  • A base fee of $12 for each over-legal dimension of height, length, width or weight.
  • $3.00 per 1,000 pounds over 132,000 pounds gross.

Minnesota: flat fees, plus a damage assessment for weight

Minnesota’s permit types page lists a $15 fee for a single-trip permit, valid 7 days. A single-trip permit that is both oversize and overweight costs “$15 + Damage Assessment Fee.” Annual permits vary by type. Construction equipment, oversize only, costs $120 a year. The overweight versions point to an “Annual Overweight Schedule.”

Oklahoma’s ODOT fee sheet lists:

Single tripFee
Oversize$40.00
Overweight$40.00, plus $10 for each 1,000 lb over the legal limit
Oversize and overweight$80.00, plus $10 for each 1,000 lb over the legal limit
Special movement fee (newly manufactured items over 16 ft and up to 23 ft wide)$500.00

A multi-trip permit costs $40 per month, up to $480 for 12 months. ODOT adds a $2.00 fax or email fee for faxed or emailed permits and a 4 percent credit card convenience fee.

Connecticut: base fee, transmittal fee and an engineering charge

Connecticut’s single-trip oversize/overweight permit has a $30.00 base fee plus a $12.00 electronic transmittal fee. Single-trip permits over 200,000 pounds add an “Engineering Analysis” fee of $2.00 per thousand pounds over 200,000. Annual divisible load permits run $9.00 per thousand pounds of permitted weight, plus the $12.00 transmittal fee.

What drives your total

Put the structures side by side and the same factors raise your cost:

  1. The number of states. You pay each state on the route separately.
  2. Width. Pennsylvania’s base fee more than doubles past 14 feet. Oklahoma charges a $500 special movement fee for some loads over 16 feet.
  3. Weight over legal. Per-pound and ton-mile charges grow with every thousand pounds, and in Pennsylvania with every mile.
  4. Superload status. Application, county and engineering fees stack on top of the base permit.
  5. Reissues and changes. North Carolina says permits are not transferable. If the permitted vehicle is wrecked, sold, traded or junked, “a new permit must be issued and the required fee(s) paid.”

If you move the same kind of load often, compare the annual fee with what you spend on single trips. The single-trip vs annual permits post covers the trade-offs, and the glossary entries for single-trip permit and blanket permit define each type.

Where to find a state’s fees

All five states above post fees on their permit page or in a fee PDF linked from it. Start at the permit office’s page and look for a “fees” link or a fee schedule. If you can’t find one, call the permit office and ask for the current schedule and its effective date. Our states list has a page for each state. If you use a permit service, ask which part of its quote goes to the state.

Sources

Checked 2026-11-05.