Route PilotPro
Guides

Route survey checklist and report template

Use this checklist when you drive a route ahead of an oversize move. The report template at the bottom follows the fields on Pennsylvania’s route survey form, M-936ARS, which lays out what a surveyor records and signs. FHWA’s pilot/escort guidelines fill in what the escort crew needs from the survey. If your state has its own form, use it, and treat this list as a backup. For what a survey is and who asks for one, read what a route survey is and when you need one.

Before you drive the route

  • Permit or permit application in hand, with the exact route. A survey checks the route the state will permit, so start from that list of roads.
  • Load dimensions written down: length, width, height and gross weight. Pennsylvania’s form asks for all four in feet and inches, plus pounds.
  • Known limits of the load vehicle noted. FHWA tells escort operators to ask whether the load is top heavy, has low ground clearance or overhangs, and whether it needs a height pole.
  • State clearance and bridge data pulled. FHWA says to use “bridge clearance, weight and width restriction data made available by State departments of transportation.”
  • Construction and seasonal restrictions checked for the route (FHWA).
  • Measuring tools ready: a height measuring tool for clearances, a camera and a notebook or form.

On the survey drive

Drive the route in the direction the load will travel. Record each item by road and mile marker.

Overhead

  • Clearance at every bridge, overpass, sign structure and traffic signal.
  • Utility lines and other wires over the road. FHWA’s route review calls out “utility lines, overpasses, and other overhead obstructions” for tall loads.
  • Your margin at each point. FHWA’s best practice sets a height pole at least 3 to 6 inches above the tallest part of the load. That gives you a sense of how thin the margin can be.

Width and turns

  • Every intersection turn the load must make, and whether it can make the turn. Pennsylvania’s surveyor certifies that “turns at all intersections can be traversed.”
  • Every width conflict, which the Pennsylvania form lists with height as “dimensional conflicts regarding width or height.”
  • The strategy you will use to get past each conflict. The form asks for one per conflict.

Grades and weight

  • Steep grades the load must climb or descend.
  • Every posted bridge and road. The Pennsylvania form certifies that the gross weight does not exceed “any highway or bridge posted weight limit.”

Railroad crossings

  • The profile of each crossing, the change in slope, the number of tracks and the road condition (FHWA).
  • Signals or stop signs near the crossing. FHWA warns that a long load “should never start across a track or series of tracks unless the load can traverse all the tracks without stopping.”
  • The railroad’s emergency phone number and the DOT crossing ID number. FHWA says both belong in the route survey, so the crew can call if the load hangs up on the tracks.

Stops and boundaries

  • Parking and staging spots for breakdowns, traffic, curfews and the end of each day. Pennsylvania’s surveyor certifies that “all parking and stop-off locations are identified.”
  • Cities and urbanized areas on the route.
  • Jurisdiction boundaries, with a contact for each, and the points where you can let traffic pass.
  • Local roads at the origin and destination. Pennsylvania lists them in parentheses on the form and makes you get permission from the local authority to use them.

Report template

Copy this layout into your own form. The fields follow M-936ARS.

Header

FieldEntry
Application or permit number
Route surveyor name or company
Survey conducted for
Date the survey was driven
Origin: county, state, route, direction, point of interest, miles and direction from intersection
Destination: county, state, route, direction, point of interest, miles and direction from intersection
Load length, width, height and gross weight

One row per conflict

Mile markerHighway or roadDescription (obstruction, width or height conflict, rail crossing and phone, staging spot, boundary and contact)Strategy used to get past itPhoto

Surveyor’s certification. Pennsylvania’s form has the surveyor certify ten points. They include:

  • safe and sufficient clearance on the entire route
  • every turn and overhead structure passable, and steep grades passable
  • cities, parking and stop-off locations identified
  • no posted weight limit exceeded
  • the survey done by driving the entire proposed route

The surveyor then signs, dates and adds a phone number and email.

After the survey

  • Note the expiry date. Pennsylvania’s survey “is valid for 21 days from date survey is physically performed.”
  • Send any problem on the permitted route back to the permit office. A survey does not change the permit. Pennsylvania lets you leave the authorized route only when a police officer directs you (67 Pa. Code 179.10(5)(v)).
  • Give copies to the driver and every escort before the pre-trip meeting. FHWA tells escort operators to get the permit and route survey in advance.
  • Check that every answer is true. The Pennsylvania form warns that false information on the permit application “shall automatically invalidate the permit.”

After the move

FHWA’s post-trip review asks four questions about the survey. Was it accurate and complete? Was the information useful to the team? Did it identify the hazards? What would make it better? Write the answers on your copy for the next move on that road.

If you use Route Pilot Pro, review the permitted route on the approved-route map before the survey drive. Stretches the app could not confirm are marked “Check against the permit,” so look at those closely on the drive. See also the glossary entries for route survey and height pole.

Sources

Checked 2026-11-05.

OVERSIZE LOAD

Scan your next permit and drive the route it approves.

Download Route Pilot Pro on iPhone or Android, scan the QR code on your permit and start the drive.