Route PilotPro
Route surveys

What a route survey is and when you need one

A route survey is a physical check of the route your load will take, done before the move. Someone drives the whole route and records every place where the load might not fit: low wires, tight turns, steep grades, rail crossings, weight-posted bridges. States ask for one on the biggest moves, and escort crews lean on it for every tall or long load.

What a survey checks

Pennsylvania’s route survey form, M-936A RS, is a good template because it spells out what the surveyor certifies. The surveyor signs that:

  1. There is safe and sufficient clearance throughout the entire proposed routing.
  2. Turns at all intersections can be traversed.
  3. All overhead structures can be traveled under.
  4. Steep grades can be traversed.
  5. Cities are identified.
  6. All parking and stop-off locations are identified.
  7. The gross weight does not exceed any highway or bridge posted weight limit.
  8. The survey was performed by driving the entire proposed route.
  9. State routes are identified by SR number.
  10. Local roads and other non-state highways are listed for routing continuity, with permission from the right authority.

The form also asks for a list of overhead obstructions, width or height conflicts, railroad crossings with contact phone numbers, parking and staging locations, jurisdictional boundaries with contacts, and traffic clearing locations. For each conflict, the surveyor names the strategy used to get past it.

Two details on that form matter to you. The survey is valid for 21 days from the date someone drove it. And the form warns: “False information given on the permit application shall automatically invalidate the permit.”

When you need one

The state decides, and the trigger differs by state and by load. Some examples from official sources:

  • North Carolina requires a route survey before it issues permits for 16-foot-wide mobile homes in specific parts of the state, according to its permit handbook.
  • Pennsylvania lists the route survey form among its hauling permit applications, next to its superload city approval form.
  • Superloads in general get closer review. North Carolina’s superload publication asks for a detailed route from origin to destination, including county and state road numbers, and at least 10 business days for internal and bridge engineering reviews.

If your permit office asks for a survey, it will say so during the application. If you are unsure, call the permit office before you book the load. FHWA keeps a list of state permit contacts on its permit page.

Why escorts care about it

FHWA’s Pilot/Escort Vehicle Operators Best Practices Guidelines tell escort operators to “obtain a copy, in advance, of the permit and any related documents (route survey, for example).” During route review, they are told to “check the route survey for information about utility lines, overpasses, and other overhead obstructions (if load is tall), and for weight restricted bridges.”

Rail crossings get special attention. The guidelines say all railroad crossings and grade changes should be included in the route survey, along with emergency contact numbers for each crossing, and the team should review that information before each day of travel. If a load hangs up on the tracks, the crew needs the railroad’s emergency number and the crossing ID number, which the guidelines say “should be included in the route survey.”

How to do one well

Drive the route in the same direction the load will travel. Turns, ramps and grades look different from the other side.

Measure, do not guess. Record clearances at every overhead structure and wire on the route. FHWA’s guidance on height poles says the pole should be set at least 3 to 6 inches above the tallest part of the load, which tells you how thin the margin is.

Note every turn. Write down whether the load can make it in one move, needs a lane closure, or needs traffic control from escorts or police. FHWA notes that a very long load may block at least two lanes on the road it turns from and two lanes on the road it turns onto.

Find your stops. List places where the load can pull over for equipment trouble, traffic, curfews or the end of the day. FHWA’s pre-trip meeting guidance asks the whole team to know these spots.

Check for change. Construction, seasonal restrictions and new signals change a route. FHWA tells escorts to compare the permitted route to construction information and seasonal restrictions. Pennsylvania’s 21-day validity window exists for the same reason.

Take photos. Pennsylvania’s form has space for them at each conflict point.

What a survey does not do

A survey does not change your permit. If the survey finds a problem on the permitted route, take it back to the permit office and get the route changed in writing. Pennsylvania lets a permitted vehicle deviate from its authorized route only when a police officer directs it (67 Pa. Code 179.10(5)(v)). See what happens if you leave the permitted route.

After the move

FHWA’s guidelines include the route survey in the post-trip review, along with communication and emergency responses. Write down what the survey missed and pass the notes to whoever books the next move on that road.

For a shorter definition, see the glossary entry for route survey. For the full list of things to check before departure, use the oversize load checklist.