How to find low bridges and clearances on your route

A permit tells you which roads to use. It does not promise your load fits under everything on them. NCDOT’s permit handbook says so in a disclaimer: “The issuance of a permit by the NCDOT does not imply nor guarantee the clearance for the permitted load(s). All vertical clearances should be checked by the permittee before moving beneath the structure and/or utility lines.” Ohio’s provisions sheet puts the same duty on you: “Permittee is responsible to check the route for abnormal, changed, or unknown/unusual conditions which may exist during any move.”

Here is where to look, and what each source leaves out.

Start with the permit route

North Carolina’s handbook sets the height maximum for a single-trip permit as “determined by vertical clearance along authorized route of travel.” Your clearance check only holds for the roads printed on the permit. Leave that route and you meet bridges, signs and wires nobody checked. The hub post on bridge and height restrictions explains how legal height and permit height fit together.

Don’t assume a standard overpass height

FHWA’s Interstate design standard says: “On Interstate sections in rural areas, the clear height of structures shall be not less than 4.9 meters (16 feet)” over the full roadway, shoulders included. In urban areas, “the 4.9-meter (16-foot) clearance shall apply to a single routing,” and “On other Interstate urban routes, the clear height of structures shall be not less than 4.3 meters (14 feet).”

That is a design standard, and FHWA adds that “Design exceptions must be approved whenever these criteria are not met.” Structures built under an exception can sit lower, and the memo covers the Interstate System only. Treat 16 feet as a design goal and check each structure.

Use the state’s clearance list or map

Many state DOTs publish low-clearance data. Read the notes, because each list measures differently.

  • South Dakota. Its Bridge Clearance List “contains all of the locations of low clearance on the state highway system.” The clearance shown “is the minimum clearance measured above the through driving lanes,” and “The vertical clearance above the shoulders may be less than the clearance shown.” SDDOT says the list “is to be used for planning purposes only” and that “It is a permit holders responsibility to verify the clearances on the route traveled.”
  • California. Caltrans lists “vertical clearances on State routes that are 14’-0” or less,” measured “from the edge of travelled way.” It warns that clearance from the edge of shoulder “may be lower at some bridges,” and that the list does not include “low clearances on local roads that run under State routes.”
  • Pennsylvania. PennDOT says “All bridges with a vertical clearance less than 14’6” are signed with low-clearance warnings, both at the bridge and in advance of the structure.” Its 511PA map has a “Low Bridge” layer for bridges under 13’6”. PennDOT counted more than 600 strikes to bridges or other overhead structures in the state between 2013 and 2023.

The South Dakota and California lists cover state highways only, so ask the local road owner about city and county legs.

Why bridge inventory data is the wrong tool

FHWA publishes the National Bridge Inventory, the bridge data states submit each year. It has clearance fields, but FHWA’s download page warns: “NBI data should not be used for route clearance purposes.” The reason it gives: “In general, bridges are inspected every 24 months, so clearance data displayed may not be current.”

Read the signs, and don’t trust a car GPS

Posted signs are the last check before you commit. NYC DOT counts “over 300 roadway locations with less than 14 feet of vertical clearance” in New York City, with some parkway clearances “as low as 6’11”.” Its truck guide says: “If your vehicle is higher than the dimension(s) shown on a traffic warning sign, you must stop and must not pass the sign.” It also warns against GPS or online maps “designed for passenger vehicles,” which “may incorrectly route you onto a local or state parkway.”

Signs and lists can disagree. Caltrans notes that some posted signs measure from the edge of shoulder, so they “may vary from the information on this list.”

What clearance lists leave out

Bridges are only part of the overhead picture. South Dakota says “Power lines and stop lights are not included on this list and are the permit holder’s responsibility to assure clearance.” Tall loads bring in utility owners:

  • Pennsylvania: over 14 feet 6 inches, a pilot car with a height pole leads, and “Affected public utilities shall be notified by the permittee at least 24 hours prior to the permitted movement” (67 Pa. Code § 179.10(13)).
  • Ohio: a load over 14 feet 10 inches must “coordinate the move with the owners of all overhead signs, signals, utilities, etc.”
  • Oklahoma: ODOT’s utilities and railroads contact form applies to “loads that are 15’9” or greater in height.”

Check it in the field

FHWA’s pilot/escort guidelines tell escorts to “Check the route survey for information about utility lines, overpasses, and other overhead obstructions (if load is tall),” and to “Use bridge clearance, weight and width restriction data made available by State departments of transportation.” See the route survey entry for what a survey covers.

On the road, the lead escort’s height pole is the moving check. FHWA’s best practice sets it “from 3 to 6 inches above the tallest part of the load.”

A clearance check you can repeat

  1. Measure the loaded height after securement, and write it down.
  2. Pull the clearance list or map for every state on the permit route.
  3. Mark every structure within a few inches of your height, and note how each figure was measured.
  4. Ask local road owners about city and county legs, and make the utility contacts your states require.
  5. Run the height pole where the permit or state calls for one, and stop at any sign lower than your load.

Route Pilot Pro guides you turn by turn along the roads your permit lists, which keeps you on the route you checked. It does not measure clearances or replace your survey. See approved-route navigation.

Sources

Checked 2026-11-05.