Route PilotPro
Route surveys

How to measure your load height before you roll

Every clearance check on your route starts from one number: the height of your loaded truck. Get it wrong and the check is worthless. Ohio’s permit provisions sheet, Form OS-1A, says that “exceeding the dimensions granted” renders the Special Hauling Permit “null and void.” PennDOT’s bridge-strike campaign is called “Check Your Height, Know It’s Right.” Here is how to get the number right, and what it sets off once you have it.

Know what the limit measures

There is no federal height limit. FHWA’s summary of federal size rules says “There is no Federal vehicle height requirement for CMVs. Thus, States may set their own height restrictions.” So the legal height, and the way it is measured, come from each state’s law:

  • Minnesota: “no vehicle unladen or with load shall exceed a height of 13 feet six inches” (Minn. Stat. § 169.81).
  • Arizona: “a vehicle unladen or with a load shall not exceed a height of thirteen feet six inches above the level surface on which the vehicle stands” (A.R.S. § 28-1094).
  • Maine: a vehicle’s structure may not exceed 13 feet 6 inches “measured vertically from a level ground surface,” and a load may not extend “more than 6 inches above the maximum permissible structural height of the vehicle” (29-A M.R.S. § 2380).
  • California: Caltrans cites Vehicle Code 35250, “no loads shall exceed a height of 14 feet,” and adds that a vehicle or load over 13 feet 6 inches may operate only on highways the owner considers safe.

Two things follow. The limit includes the load, and the measurement starts from a level surface. Check the legal height for every state on your route. The legal size limits entry and the hub post on bridge and height restrictions cover more states.

Load it as low as it will go

Height starts at loading. Ohio’s OS-1A says permits “will not generally be issued” for loads “that have not been loaded to the least over dimension.” PennDOT’s campaign reminds drivers “to lower truck beds and check the height of equipment they’re hauling.” Fold, lower or remove what you can before you measure, and put the load on the lowest deck that carries it safely.

How to measure

No state document we checked prescribes a tool or step-by-step method. The steps below follow the wording of the laws above: a level surface, the vehicle as loaded, the highest point.

  1. Load and secure first. Measure after the tie-downs, blocking and any covers are on, because they can sit above the cargo.
  2. Park on level pavement. Arizona and Maine both measure from a level surface. A slope, a curb or a soft shoulder changes the reading.
  3. Find the highest point. Walk the whole load. The top may be a cab, an exhaust stack, a boom, a rack or a strap over the top, and it may sit at the back or the side.
  4. Measure straight up from the ground to that point. Hold the measuring pole or tape plumb. Have a second person read it at eye level if you can.
  5. Measure more than one high spot. If the load has two peaks, measure both and keep the taller one.
  6. Round up and write it down. Record feet and inches, the date and where you measured. Keep the note with the permit.

NYC DOT’s truck guide sets the habit: “Know your vehicle’s accurate height, length, and width (both cab and trailer), loaded and unloaded.”

Put the measured number on the permit

Apply with the height you measured. Ohio voids a permit when you exceed the dimensions granted. If your measured height comes out taller than the permit after loading, stop and contact the state’s permit office before you move. A different height can change the route, the escorts and the utility contacts.

What the number sets off

Your height decides more than which bridges you fit under. Some thresholds from fetched state rules:

StateHeightWhat it requires
OhioOver 14 ft 6 inOVERSIZE LOAD signs, and a lead escort “equipped with a height sensing device”
OhioOver 14 ft 10 inLead and rear escorts, and coordination “with the owners of all overhead signs, signals, utilities, etc.”
PennsylvaniaOver 14 ft 6 inA pilot car 1,000 to 3,000 feet ahead with a height pole, and utilities notified at least 24 hours before the move
Oklahoma15 ft 9 in or moreODOT’s utilities and railroads contact form

Pennsylvania’s rule is 67 Pa. Code § 179.10(13). Ohio’s are on Form OS-1A, and Oklahoma’s form is on ODOT’s permit page. Your permit may add more, so read it.

Set the height pole from your number

When an escort runs a height pole, it is set from your measurement. FHWA’s pilot/escort guidelines say “all height poles should be, at a minimum, set from 3 to 6 inches above the tallest part of the load.” The steps are: “Measure the load and set the height pole, with the assistance of the load driver,” then “Confirm the height with the load driver.” FHWA notes that “States vary in what they require when installing the height pole,” so check the permit and the state rules for the setting.

Measure again when anything changes

Re-measure if you shift, add or re-secure cargo, swap trailers, or adjust anything on top of the load. A number from the yard this morning does not cover a load someone changed at noon.

Sources

Checked 2026-11-05.

OVERSIZE LOAD

Scan your next permit and drive the route it approves.

Download Route Pilot Pro on iPhone or Android, scan the QR code on your permit and start the drive.